Sign In | Join Free | My ecer.co.uk |
|
Categories | Beach Sunshade Umbrella |
---|---|
Model Number: | LWD-1025A |
Place of Origin: | China |
Payment Terms: | T/T or western Union T/T or PayPal or WestUnion; 30% deposit against order confirmation,balance 70% to be paid before shipment |
Supply Ability: | 3,000pcs per month |
Delivery Time: | 15 working days after received your payment |
Packaging Details: | Unite package for umbrella:195x33x14cm;For base:61x41x8cm |
MOQ: | Negotiation |
Price: | Negotiation |
Product Name: | Popular 3M Outdoor Banana Umbrella |
Pole Material: | Aluminum alloy |
Base: | Marble |
Size: | Dia.270cm/300cm |
Color: | Beige,Dark Green,or customized |
Fabric: | Coated strength polyester |
Umbrella Radii: | 135cm |
Company Info. |
DONGGUAN SMARTENT OUTDOOR SUPPLIES CO.,LTD |
Verified Supplier |
View Contact Details |
Product List |
Commercial Large Silver Side Mount Patio Umbrella , Contemporary Outdoor Umbrellas
Specifications
Name | Banana Umbrella | ||
Size | Dia 2.7m / Dia 3m | ||
Fabric | Polyester / Recasen (Imported in Spain) and Taiwan fabric | ||
Feature | Durable,UV resistant and waterproof | ||
Color | Dark green / wine red / beige and khaki (customised) | ||
Base | Marble base | ||
Operation | Manual open | ||
Logo | According to customer's design | ||
OEM | Welcomed | ||
MOQ | 1 Set | ||
Sample time | Within 7 working days | ||
Usage | Shade shelter and decoration | ||
Payment | 30% deposit before for production, balance 70% paid before
shipment. | ||
Application | Backyard ,Outdoor , Shopping Street,etc. |
Packing | 1. Air bubble paper package inside, thick carton package outside 2. Plastic bubble paper and woven bag packing 3. 1 set per carton 4. Export standard carton packing |
---|---|
Leadtime | Shipped in 25days after deposit payment. |
How to order our product?
1. Send us your inquiry,model and quantity or we can offer you customized you want,get latest price.
2. Confirm the order,including material,colors,delivery date and then confirm our PI.
3. Arrange the deposit,and then start productions accordingly.
4. Keep you posted the order status,update you the productions process and finish them in four~six weeks.
![]() |