Categories | Copper Pipe Heat Sink |
---|---|
Brand Name: | LF |
Model Number: | LF-Y8202 |
Certification: | ISO9001:2008 |
Place of Origin: | Dongguan,Mainland China |
MOQ: | 100pcs |
Price: | The most reasonable price |
Supply Ability: | 10000/month |
Delivery Time: | 15-30 workdays |
Packaging Details: | Carton or as your requirements |
Material: | Pure Copper C1100 Strips |
Process: | Die castings |
Aplication: | CPU |
Color: | Design |
Type: | Heatsinks |
ODM&OEM: | Yes |
Company Info. |
LiFong(HK) Industrial Co.,Limited |
Verified Supplier |
View Contact Details |
Product List |
Die Stamping Copper Fin CPU Aluminum Bottom Heatsink Copper Pipe Heat Sink
Specifications:
1. Overall dimensions: L56*W56*H26mm
2. Copper fin thickness: 0.4mm
3. Fin quantity per row: 28pcs * 16pcs
4. Aluminum bottom wall thickness: 2mm
5. Part weight: 56 grams
6. Materials: pure copper C1100 strips, purity over 99.5%
(Standard: JISH3250-2006), pure aluminum board A1060 purity over
99.6% (Standard: GB/T3880-2006)
Little impurity brings very good electrical and heat conduction,
excellent performance in corrosion resistant as well
Processing technic:
1. Copper fins: progressive die stamping
2. Aluminum enclosure and board: forming die stamping
3. Aluminum board and enclosure nickel plated, copper fin passivate
(insulation, oxidation and corrosion resistance)
4. Assembly: automatic fin wearing/assembly, then fixed by overflow
soldering and screw/rivet combination
5. Quality check
6. Packing
Description:
| Copper Pipe Heat Sink | |
Item No. | LF-Y8202 | |
Service | Drawings or sample processing | |
Materials | Pure Copper C1100 Strips,JISH3250-2006,GB/T3880-2006 | |
Precision processing | progressive die stamping,forming die stamping,automatic fin wearing/assembly,fixed by overflow soldering,screw/rivet combination | |
QC (inspection everywhere ) | 15-30days,it is up to the order. | |
Package | PP bag/carton or according customers' requirement | |
payment term | T/T,L/C |
Advantages:
1. Professional research and design team, strong &automatic equipment
2. Progressive stamping, automatic soldering machine
3. Strict quality control in each process and finish product
quality control
4. Short delivery lead time: 15-30 days
5. Optional for OEM or ODM
6. Comprehensive after-sale service, quick responses for daily
communication
Factory